Workshop Open Mon–Sat    8:00 AM – 5:00 PM
Home / How We Work

How We Work

From the first briefing to the final installation — every project follows a disciplined, eight-stage process. It’s how we deliver signage that performs, on schedule and to specification.

An end-to-end signage process, refined since 2010.

8Stages
16Years
100%In-house
The Process

Eight stages, one accountable team

Each stage is owned by a specialist within MRPM — no outsourcing, no hand-offs to third parties. That’s how we keep quality, schedule, and safety under one roof.

01Discover
Briefing / Ocular

Briefing / Ocular

We meet you on-site to understand brand goals, viewing distance, structural conditions, and local permit constraints.

02Plan
Project Assessment

Project Assessment

Engineering, design, and production review the brief together to confirm scope, materials, lead time, and budget.

03Design
Shop Drawing

Shop Drawing

Detailed CAD shop drawings, material specs, and rendered visuals are produced for client sign-off before any material is cut.

04Build
Cutting & Fabrication

Cutting & Fabrication

CNC routing, laser cutting, welding, and acrylic forming executed in our Valenzuela facility to the approved drawings.

05Finish
Painting

Painting

Automotive-grade paints, powder coatings, and weatherproof finishes applied in a controlled booth for a flawless surface.

06Verify
Quality Checking

Quality Checking

A multi-point QC inspection — dimensions, illumination, electrical safety, and finish — before anything leaves the floor.

07Ship
Delivery

Delivery

Crated, padded, and dispatched with our own logistics team — tracked door-to-door across Luzon, Visayas, and Mindanao.

08Install
Installation

Installation

Certified riggers and electricians install on-site with full PPE, permits, and documentation — clean handover, no surprises.

Inside the Process

What happens at each stage

A closer look at the deliverables, decisions, and people involved at every step of a typical signage project.

Stage 01 · Briefing / Ocular

We listen first, then measure twice.

An MRPM project lead visits the site with the client to capture the brief in context — not over a phone call.

  • Site survey & environmental assessment
  • Brand alignment & objectives capture
  • Permit and structural pre-checks
01
02
Stage 02 · Project Assessment

Engineering, design and production align.

Internal review where every discipline weighs in before a single peso is spent on materials.

  • Material & structural feasibility
  • Cost engineering & quotation
  • Production schedule & risk register
Stage 03 · Shop Drawing

Drawings the fabricator can build from.

Full documentation — elevations, sections, electrical, fixings — issued for client approval before fabrication.

  • 2D shop drawings & 3D renders
  • BOM, finishes & lighting specs
  • Client sign-off package
03
04
Stage 04 · Cutting & Fabrication

Built in our own facility, by our own crew.

CNC, laser, welding, and forming all happen under one roof in Valenzuela — full visibility, full control.

  • CNC routing & laser cutting
  • MIG/TIG welding & metal forming
  • Acrylic, aluminum, stainless & composite work
Stage 05 · Painting

Finishes that survive Philippine weather.

Automotive-grade and weatherproof finishes applied in a temperature-controlled paint booth for consistent color and durability.

  • Powder coating & PU finishes
  • Brand-matched color formulation
  • UV & salt-spray resistant systems
05
06
Stage 06 · Quality Checking

A unit only ships when QC signs the form.

Every assembly is checked against shop drawings and electrical safety standards before crating.

  • Dimensional & finish inspection
  • Illumination & electrical load test
  • Documented QC sign-off per unit
Stage 07 · Delivery

Tracked, crated, and on time.

Our in-house logistics team handles transport, so the unit that left QC is the unit that arrives on site.

  • Custom crating & padded transport
  • Nationwide coverage — Luzon, Visayas, Mindanao
  • Live dispatch coordination with site
07
08
Stage 08 · Installation

Safe, certified, and clean handover.

Our riggers and electricians install on-site under full PPE protocols, with permits in hand and a documented turnover.

  • Certified riggers & licensed electricians
  • Full PPE & site safety protocols
  • Final commissioning & client turnover
By the Numbers

Why this process delivers

Because we own every stage in-house, we can guarantee timelines, costs, and quality in a way most signage suppliers in the country simply cannot.

16
Years in operation
200+
Projects delivered
100%
In-house production
8
Stage QA process
Our Promise

What clients can expect from MRPM

On-time delivery

A production schedule is issued at Stage 02 and reviewed weekly. If a milestone moves, you hear about it before it slips.

Documented quality

Every unit ships with a QC sign-off and electrical compliance check. No verbal “all good” — only paperwork that holds up.

Single point of contact

One project lead from Stage 01 to Stage 08. You never have to re-explain the brief to a new person mid-project.

Full transparency

Shop drawings, BOMs, fabrication photos, and QC reports — shared at every stage so there are no surprises at handover.

Nationwide reach

From our Valenzuela facility we deliver and install across Luzon, Visayas, and Mindanao with our own crews and partners.

Built for the long run

Materials and finishes are specified for Philippine sun, rain, and salt air — your sign should still look new five years in.

Have a brief? Let’s start at Stage 01.

Tell us about your signage project — we’ll respond within one business day with next steps and an ocular schedule.